Suspended Ceiling Kit Assembly & Installation (cont.)
15
Place dome over Air Pear unit and align it with
screw holes. Note that cutout should face the
j-box mounting location. Dome should seat into
the rim designed for it on the base, if necessary
gently push the dome edge in until it seats
inboard of the rim.
Insert the four Phillips screws (10-32 x 5/8”
provided) through ears in dome and into threaded
brass inserts. Screws will go in easily when
aligned properly. Do not overtighten, as galling or
stripping could occur.
When dome is installed, the power cord needs to
be fed through the cutout in the dome.
Have an electrician or similarly qualified person
wire, with MC-type cable, the supplied receptacle
into the j-box in close proximity to the intended
installation location. Fasten the supplied metal
faceplate to the j-box. Follow all local and
National Electric Codes. MC cable should have
enough length to ensure easy installation.
Place the assembled suspended ceiling kit into
the T-bar grid. The air intake grille is designed to
replace a 2’ x 2’ ceiling tile. If replacing a 2’ x 4’
tile, please use an additional piece of 2 ft. T-bar
suspension material to finish the edge and
provide additional strength and rigidity to the
existing suspension system.
5
3
4
Note cord position